Hamada Boiler (China) Co., Ltd
中国浙江省杭州市江南大道3880号华荣时代大厦1705室
邮编:310053
Tel. : +86 571 8765 5979 /5989
Fax : +86 571 8765 5969
Boiler CFBC 75 ton/h 60 bar 450 °C
with condensing turbine 15 MW
|
燃煤热电联产电厂
|
产品
|
返回至主页
|
15 MW Turbine is used in this power plant coupled with 75 ton CFBC boiler
Side view of 75 ton/h CFBC coal fired boiler with 60 bar 450° s.heated steam
Overview of the power plant of 15 MW with 75 ton boiler
All membraine wall construction makes easy to install within a short period
历史
用户列表
产品
咨询留言