| POWER PLANT & ACCESSORIES |
Pictures |
| Boiler
CFBC 75 ton/h 60 bar 450 °C with condensing turbine
15 MW |
click
here |
| Boiler
CFBC 35 ton/h 60 bar 450 °C with extraction turbine
6 MW |
click here |
| Electrostatic
Precipitator EP with ash discharge system and ash silo |
click here |
| Coal
conveyor, Coal Silo, Coal feeder with auto-weighing
device |
click
here |
| Watercooled
plunum, air nozzle, air box, ash cooler, igniting burner |
click
here |
| High
temp. Cyclone and Ash Circulating System, Special Castable Protection |
click
here |